ALLEN JOINERY

CALL US ON 07854 509815

Adding a glazed floor

This project was our biggest challenge of 2016.

Existing balustrading was removed around the existing ceiling lights and 42mm-thick glazed floor panels were fitted within structural steel frames.

The panels are strong enough to enable safe foot traffic – and accommodate a table tennis table!